




🌟 Special thanks to our amazing supporters:
✨ $10 Tier: [Geeks Love Detail]
🌈 $5 Tier: [Benedikt][David Martínez Martí]
NEW: Collect upkeep each cycle for Shunting Track and Stabling Sensor
UPDATE: Increased minimum default ui scale for smaller resolutions
UPDATE: Localizations (zh-Hans: research, tutorials, ui; no: ui)
UPDATE: Reg train Intermission now measured from arrival to departure (was: from departure to arrival), making leg's last stop and next first stop be included in intermission - their lenght now does not matter. Brings better stabling platform allocation visualization and earlier leg switch possibility.
UPDATE: Upkeep rebalanced for Shunting Circuit (1000), Shunting Track (2000), Stabling Sensor (4000) and Coach Yard (10000)
FIX: CycleBalance.Upkeep was not saved
FIX: Lists with filters were not cleared when filter was modified to unmatching string (no result expected) while the list was still being loaded
[ 6081 ]
[ 2064 ]
[ 1907 ]